Case Study:Cotton gin external walls built with ZEGO ReFORM formwork system
Barker Constructions were commissioned to project manage the construction of a new cotton gin by RivCott Gin in 2015 at Carrathool in the Riverina region of NSW. RivCott CEO, Samuel Buster chose ZEGO ReFORM, a reusable formwork system as the preferred method for building the external walls using the ReFORM 200mm and 300mm concrete core.









